Bondsville - BFWD 2025-01 State Street Waterline Extension Project

The Project consists of connecting into the existing 12-inch watermain on High Street. Removal and replacement of 80-feet of asbestos cement (AC) watermain with 12-inch cement lined ductile iron (CLDI) along State Street. Then continued down State Street 1460- feet with the 12-inch CLDI while abandoning the AC pipe in place. The 12-inch CLDI will be increased to 16-inch CLDI for approximately 3,425 linear feet to the intersection with Jim Ash Street where it will be constructed to the entrance of the access road for the proposed new water tank. The project includes all the associated valves, hydrants, connecting the existing customers to the new watermain as well as installing 23 new service lines to the curb stops to the properties with existing homes on them. Final restoration shall include permanent trench pavement and loaming and seeding.

Status

Accepting Bids

Prebid Date 8/13/25 2:00pm
Bid Date 8/27/25 2:00pm

Company & Contacts

Bondsville Fire & Water District
Elizabeth Boutilette  
508-248-2005

Location

State Street (South High Street to Jim Ash Street), Palmer, MA

= BID DATES =

Non – Mandatory Prebid on 08/13/25 at 2:00 PM.

All Bids Due on 08/27/25 at 2:00 PM.


= PURCHASE & SHIPPING INFO =

For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing. Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed.

Shipping via UPS is additional.